Urban transformation, step by step
From the risky building report to the keys of your new flat, the process runs in 12 steps.
The 12 steps of urban transformation
Gather information
Collect your building’s documents: title deed, design drawings and permits.
Apply for an assessment
The owner or their legal representative applies to an institution licensed by the Ministry.
Technical inspection
The institution takes concrete core samples, checks the reinforcement and prepares the report.
Approval and notification
The authority reviews the report, an annotation is added to the title deed and owners are notified.
Objection period
Owners who disagree with the report can object within the legal period after notification.
Owners’ meeting
The owners meet to discuss the new design and the contractor, and take a decision.
Majority decision
A decision taken by an absolute majority, weighted by land share, binds all owners.
Contract with the builder
Flat allocation, timelines, materials and rent support are set out in a notarised contract.
Evacuation
The building is vacated within the given period and electricity, water and gas are cut off.
Demolition
The building is demolished under permit, with safety measures in place.
Permit and construction
The building permit for the new design is issued and construction begins under inspection.
Occupancy and handover
The occupancy permit is issued and the flats are handed over to the owners with their title deeds.
Where we help
Short answer: at every step. From the risky building application to handover, we plan each step with you and follow up the paperwork and appointments. We attend the owners’ meeting and answer your neighbours’ questions.
For more detail, see our pages on risky building assessment, majority decisions and meetings and evacuation and demolition.
The information on this page is for general guidance only and is not legal advice. Legislation and support amounts change from time to time, so please confirm the current position with the Ministry of Environment, Urbanisation and Climate Change or a lawyer.
Frequently asked questions
Short answers to the questions we hear most about this topic.
All questionsDo I have to follow all these steps myself?
No. The contractor and consultants you work with handle most of these steps for you. You need to make the decisions and sign the necessary documents.
Which step takes longest?
Usually the owners reaching agreement, and the construction itself. When owners agree quickly, the whole process is noticeably shorter.
How long does a risky building report take?
It depends on the institution, the size of the building and how long the authority takes to review it. You will be given an approximate timeframe when you apply.