Urban transformation, step by step

From the risky building report to the keys of your new flat, the process runs in 12 steps.

The 12 steps of urban transformation

  1. Gather information

    Collect your building’s documents: title deed, design drawings and permits.

  2. Apply for an assessment

    The owner or their legal representative applies to an institution licensed by the Ministry.

  3. Technical inspection

    The institution takes concrete core samples, checks the reinforcement and prepares the report.

  4. Approval and notification

    The authority reviews the report, an annotation is added to the title deed and owners are notified.

  5. Objection period

    Owners who disagree with the report can object within the legal period after notification.

  6. Owners’ meeting

    The owners meet to discuss the new design and the contractor, and take a decision.

  7. Majority decision

    A decision taken by an absolute majority, weighted by land share, binds all owners.

  8. Contract with the builder

    Flat allocation, timelines, materials and rent support are set out in a notarised contract.

  9. Evacuation

    The building is vacated within the given period and electricity, water and gas are cut off.

  10. Demolition

    The building is demolished under permit, with safety measures in place.

  11. Permit and construction

    The building permit for the new design is issued and construction begins under inspection.

  12. Occupancy and handover

    The occupancy permit is issued and the flats are handed over to the owners with their title deeds.

Where we help

Short answer: at every step. From the risky building application to handover, we plan each step with you and follow up the paperwork and appointments. We attend the owners’ meeting and answer your neighbours’ questions.

For more detail, see our pages on risky building assessment, majority decisions and meetings and evacuation and demolition.

The information on this page is for general guidance only and is not legal advice. Legislation and support amounts change from time to time, so please confirm the current position with the Ministry of Environment, Urbanisation and Climate Change or a lawyer.

Frequently asked questions

Short answers to the questions we hear most about this topic.

All questions
Do I have to follow all these steps myself?

No. The contractor and consultants you work with handle most of these steps for you. You need to make the decisions and sign the necessary documents.

Which step takes longest?

Usually the owners reaching agreement, and the construction itself. When owners agree quickly, the whole process is noticeably shorter.

How long does a risky building report take?

It depends on the institution, the size of the building and how long the authority takes to review it. You will be given an approximate timeframe when you apply.