Checklist
Is it a notarised deed?
Because it includes a promise to transfer title, a flat-for-land contract should be drawn up as an official deed at a notary. A simple private contract will not protect you.
Is the flat allocation clear?
It should state which flat goes to whom, with floor, aspect and floor area. Vague wording such as “a suitable flat” causes trouble.
How will floor areas be measured?
Gross or net? Balconies included? If the method is not written down, disputes can arise at handover.
Are there start and handover dates?
Dates or periods for obtaining the permit, starting construction and handover should be clearly stated.
What happens in case of delay?
The compensation or rent the contractor will pay in case of delay should be in the contract.
Is a materials list attached?
The brands and grades of materials should be listed in an annex. “First-class materials” on its own is not enough.
Rent or moving support
If the contractor will pay rent support, the amount, duration and payment date should be written down.
Who pays the costs?
Design, permit, fees, building inspection, utility connection and occupancy permit costs should each be assigned.
When are title deeds transferred?
The stage of work at which the contractor’s flats are transferred should be fixed. This is your most important safeguard.
Is there a guarantee?
A bank guarantee, mortgage or similar security against the risk of the work being left unfinished should be discussed.
A final word
This list is a starting point. We strongly recommend having your own lawyer read the contract before you sign. A contractor acting in good faith will not mind; in fact, they will welcome it.
To learn how the flat-for-land model works, see our flat-for-land construction page.
This article is for general information only and is not legal advice.